Risk-Based Monitoring was introduced in ICH E6 (R2) in 2016, and we’ve all felt the changes of this implementation over the past 24 months. But what does it look like when a study runs with RBM? Dive deeper into the case-study of RBM implementation with Kirill Soldatov and Jo Thomas.